| May 26th |
|
 
|
Inside before construction. This was a former Curves location.
The dressing rooms will become storage. |
 |
Last look before we transform to Bead Q! |

|
From the back. There I am taking down the old lettering making
room for our sign. |

|
Our temporary sign is up and the whole world is now in on it. |
| June 1st |
 |
We have decided on a different color scheme as an attempt to warm
up the space. I am hoping that brown and taupe were the right choices.
Thanks to a painter with an expecting wife, this job was pushed up!
Apparently they had a healthy baby a few days after the job was done. |
| June 4th |
 |
Slatwall was delivered today. We asked for 1 hour notice, they gave
me 30min. with an early morning call. Threw on some clothes, brushed
a couple of teeth, and sped all the way to the westside to make the
delivery! As luck would have it, I sped right in front of the truck
and pulled in before he did! |
| June 5th |
 |
Slatwall installation schedule. Slatwall installation cancelled.
Small problem, there is not enough support behind the drywall to
hold up the slatwall and all of our rocks!
At least there is an entry! |
| June 7th |
 |
An unexpected phone call from a friend resulted in free displays.
The back room has been transformed to my workshop. |
 |
Workshop |
| June 12th |
 
 |
Lighting. You can barely see it but there are spot lights up.
Jewelry cases painted.
Applied for occupancy permit today. |
| June 13th |
Contractor withdrew from slatwall installation job.
Occupancy permit declined. Ask me sometime this is long story.
More stuff to be addressed.
Found new contractor for slatwall installation. Can not do work
until the weekend...ok. |
| June 14th |
Early morning call from contractor, can do work now. Throw on some
clothes, brush a couple of teeth race to westside. |
| June 19th |
Carpet installation has begun. |
| June 20th |
|
 |
We have made it more official, we installed our sign on the street
and on the windows.
|
|
Carpet installation complete. |
| June 20th |
|
|
Details. |
 |
Displays placed. |
| June 24th |
Almost done. All displays are complete. All that is left if product
placement and a permit. |
|
July 3rd
With help from the new crew almost all of the BEADS! are in place.
We have less than a couple hours of work to be ready to open.
Latest news, the electrician will finish getting his permit when
he gets around to it. Can I just say OMG! |
|